Plain-language lessons from the engineers at Lane Coburn & Associates — the calculations, code requirements, and field judgment behind mission-critical electrical design, taught the way we explain it to owners, contractors, and reviewers.
Kirkland, WashingtonElectrical engineering & telecommunications consultingMission-critical facilities & data centers
LCA University
Engineering, Explained.
Lane Coburn & Associates, LLC Est. 2007 · Kirkland, WA
Meet Your Instructor
Keith Lane, P.E., RCDD, NTS, RTPM, LC, LEED A.P.
President/CEO & Chief Engineer, Lane Coburn & Associates, LLC
Electrical engineer and trial-experienced expert witness with hands-on construction experience. Keith is the author behind LCA University — these lessons come straight from his design, forensic, and expert-witness work.
Start with the newest lessons — or dig into the archive
Pick a collection below. Each new article opens as the full article (PDF) from the LCA Engineering Library; the previous articles are LCA's published magazine work — tap any cover to open the original article.
The newest LCA articles. All 15 articles from the LCA Engineering Library are below — tap any card to open the full article (PDF).
The complete LCA publications archive. Every published magazine article is below, with the cover page it ran with — tap any card to open the original article. The same collection also lives on the LCA website.
Every lesson follows the same arc — the problem we see in the field, what the rules actually say, the key numbers, and how we approach it at LCA.
Cable Pulling & Pulling TensionNeher–McGrath & Underground AmpacitySelective CoordinationUPS & Critical PowerFault Current CalculationsDuct Bank HeatingLightning ProtectionData Center Electrical Design
Prefer to watch? The lessons are on video, too.
LCA's YouTube channel carries animated construction visualizations, project flyovers, and walkthroughs of the same systems the articles teach — the articles and the videos feed each other.
LCA University is the teaching-article series of Lane Coburn & Associates, LLC — “Engineering, Explained.” Each lesson explains the calculations, code requirements, and field judgment behind mission-critical electrical design in plain language, the way LCA explains them to owners, contractors, and reviewers.
Who writes the LCA University articles?
The articles are written by Keith Lane, President/CEO and Chief Engineer of Lane Coburn & Associates, and draw directly on his design, forensic, and expert-witness work. Scott Coburn, co-founder of the firm, is co-author of several lessons, including “Cooked in the Ground” and the cable-pulling series.
What topics do the articles cover?
Topics include cable pulling and pulling tension, Neher–McGrath calculations and underground ampacity, duct bank heating and soil dry-out, shipboard electrical systems, selective coordination, UPS and critical power, fault current calculations, arc flash, and data center electrical design.
Are the articles free to read?
Yes. Every article on this page is free to read — tap any New Articles card to open the full article (PDF), and the Previous Articles archive links to LCA’s published magazine articles.
Who are Keith Lane and Scott Coburn?
Keith Lane, P.E., RCDD, NTS, RTPM, LC, LEED A.P. is President/CEO and Chief Engineer of Lane Coburn & Associates, a professional electrical engineer licensed in 20 states and a trial-experienced expert witness with 41 expert-witness cases. Scott Coburn co-founded Lane Coburn & Associates with Keith in 2007.
How do I contact Lane Coburn & Associates about a study or a project?
Call Lane Coburn & Associates at 206-499-5221 or email klane@lanecoburn.com. The firm’s office is at 5535 Lake Washington Blvd NE, Suite 309, Kirkland, WA 98033, and its main website is lanecoburn.com.
LCA University · Engineering, Explained. — A Lane Coburn & Associates Teaching Series | Vol. 1 | November 2026
Lesson Category: Marine & Shipboard Power Systems
Power at Sea: Why a Ship’s Electrical System Has to Save Itself
By Keith Lane, PE, RCDD, NTS, RTPM, LC, LEED AP — President & Chief Engineer | Lane Coburn & Associates, LLC
Written for ship owners, shipyards, and project teams — no engineering degree required. Approx. 6-minute read.
Figure 1 — A ship’s main switchboard is its power plant control room: generation, distribution, and protection in one lineup, steps from the machines it feeds.
The Problem We See
On land, if a building loses power, the utility is still out there. A ship at sea has no such backup. Its generators, switchboards, and cables are the entire utility — generation, transmission, and distribution compressed into a steel hull. If that system fails completely, the vessel loses propulsion, steering, lighting, communications, and firefighting power at the same time, in the one place it can least afford it.
So shipboard design is built around one blunt question: what still works after something fails? On a recent shipboard power project, as on most vessels we review, the one-line looked fine on paper. The hard work was in what it did not show — which generator carries the ship when the largest one trips, which loads shed first, where a ground fault would hide, and whether a distant breaker trips before the main does. Those answers come from the grounding decision and from the studies.
What the Rules Actually Say
Shipboard systems in U.S. service are designed under the U.S. Coast Guard’s electrical regulations (46 CFR Subchapter J), the rules of the vessel’s classification society — most often ABS, the American Bureau of Shipping — and IEEE Std 45, with SOLAS Chapter II-1 setting the international baseline. Together they require two independent sources of power, an emergency source that starts and loads automatically, and distribution arranged so one fault, fire, or flooded space cannot take the whole ship dark.
Distribution: two switchboards in one, and a way ashore
A typical vessel generates at 480 V (larger vessels at 690 V or medium voltage) from two or more diesel generators feeding a main switchboard split into at least two sections by a bus-tie breaker. Either section can carry the essential ship alone; the bus tie turns two half-systems into one resilient system. Feeders run to load centers and panels throughout the ship, while a separate emergency switchboard — outside the machinery space, fed from the main board and from its own emergency generator — carries steering, navigation lights, emergency lighting, alarms, and fire detection. Shore power lets the vessel plug into the pier and shut its generators down, interlocked so the ship cannot backfeed the pier or parallel out of phase. Non-essential loads, such as galley and laundry equipment, are wired to shed automatically in stages when generation runs short, protecting propulsion and steering to the last.
Grounding: the hull is the ground — but the system may not be
On a steel ship there is no earth to drive a rod into. The hull is the ground reference, and every exposed metal part — equipment frames, motor cases, cable armor and trays — is bonded to it, so a fault raises no dangerous touch voltage and has a solid return path. The system itself, however, is often deliberately not solidly grounded. Most shipboard distribution is ungrounded or high-resistance grounded: a first ground fault raises an alarm at the switchboard’s ground-detection lamps or monitor but trips nothing, and the ship keeps running while the crew finds the fault. That continuity is a safety feature at sea — with one discipline attached. A first fault left in place means a second fault on another phase is a full short circuit, so alarms must be answered, insulation resistance trended, and faults cleared promptly. Ungrounded systems also need protection against the transient overvoltages that arcing faults can produce.
Figure 2 — Grounding at sea: equipment is bonded to the steel hull (green), ground faults are detected and alarmed, and the system is arranged to keep running on a first fault.
Key Numbers — Shipboard Power
Two independent power sources minimum, plus an emergency generator that starts and loads automatically
Main switchboard split into at least two sections, joined by a bus-tie breaker
First ground fault: alarm, don’t trip — find it and clear it before a second fault finds you
Essential loads — steering, bilge, fire, navigation — are the last loads shed, never the first
How We Approach It at LCA
We start where every marine study set starts: with an honest load list. From there, five studies prove — or correct — the design before cable is pulled, because at sea there is no utility engineer to call and no easy retrofit once bulkheads are closed.
Load analysis. Every load listed, rated, and classified — continuous, intermittent, or standby; essential or non-essential — with demand factors applied by operating condition: sailing, maneuvering, in port, and emergency. This sizes the generators and proves the ship can lose its largest one and still carry its essential load.
Short-circuit study. Fault current is calculated at every board and panel, including motor contribution — significant on a ship full of large motors close to the source. Breakers and bus bracing are then specified to interrupt and withstand it.
Protective device coordination. Time-current curves are plotted so the breaker nearest a fault opens first and the main opens last. Selective coordination keeps a galley panel fault from blacking out the engine room — in normal and emergency operation alike.
Arc-flash study. Incident energy is calculated at each working location and equipment is labeled, using IEEE 1584 methods adapted to the shipboard system. Compact switchboard rooms leave little working distance, so this study drives both PPE and design choices that lower the energy itself.
Voltage drop, motor starting, and harmonics. Long runs to thrusters, windlasses, and steering gear are checked for running drop and for the dip when the largest motor starts; variable-frequency drives are checked for harmonic distortion against IEEE 45 and class limits so they do not overheat generators and cables.
Finally, the studies are run for the cases that actually hurt ships — one generator out, emergency generator alone, shore power connected, and dead-ship recovery — not just the all-generators case. Where a study finds a problem, the fix is made on paper: a larger cable, a different breaker or trip unit, a rebalanced panel, or a revised load-shed sequence.
Figure 3 — The studies start with the one-line: load flow, fault current, and coordination are only as good as the model behind them.
“On a ship, the electrical system is the utility, the lifeboat, and the fire department — design it like all three.”
The Takeaway
Build the load list first, by operating condition — it sizes everything else.
Decide the grounding method early; it drives fault detection, coordination, and arc-flash results.
Coordinate selectively — and prove it for emergency and shore-power operation too.
Study the bad days: largest generator out, dead-ship recovery, and the largest motor starting.
Answer every ground-fault alarm. On an ungrounded system, the first fault is your warning — the second one is the casualty.
About the Author
Keith Lane, PE, RCDD, NTS, RTPM, LC, LEED AP is President, CEO, and Chief Engineer of Lane Coburn & Associates, LLC of Kirkland, Washington, with over 30 years in the electrical construction and engineering industry. LCA provides electrical design, power system studies, and forensic and expert-witness services for mission-critical and industrial facilities — on land and afloat. Questions about a vessel, a facility, or a study? Please contact us if you’d like to discuss your project.
Lane Coburn & Associates, LLC | 5535 Lake Washington Blvd NE, Suite 309, Kirkland, WA 98033 | 206-499-5221 | lanecoburn.com
Watch the companion videos: youtube.com/@lanecoburnassociates | LCA University articles are educational and do not replace project-specific engineering.
LCA University · Engineering, Explained. — A Lane Coburn & Associates Teaching Series | Vol. 1 | November 2026
Lesson Category: Underground Power Systems & Forensic Engineering
Cooked in the Ground: Why Underground Feeders Overheat — and Fail
By Keith Lane, PE, RCDD, NTS, RTPM, LC, LEED AP, and Scott Coburn | Lane Coburn & Associates, LLC
Written for data center owners, developers, and project teams — no engineering degree required. Approx. 6-minute read.
Figure 1 — A large duct bank under a critical facility. The center conduits run hottest: each cable heats its neighbors, and all of the heat has to escape through the soil.
The Problem We See
It rarely starts with a bang. It starts with a breaker that trips on a hot afternoon and nobody can explain why. Then trips again. Maintenance smells something sharp and chemical near a vault or pull box — insulation off-gassing as it cooks. Months or years later, a feeder fails outright: a short circuit underground, an emergency excavation, a critical facility running on its remaining feeders or on generators while a duct bank is dug up and rebuilt. It is one of the most expensive failures in a data center, and in our forensic work it is almost never bad luck.
Lane Coburn & Associates has analyzed overheated and failed underground conductors for years, frequently as expert witnesses after the failure. When we reconstruct what happened, the finding is remarkably consistent: the engineer of record never performed the Neher–McGrath heating calculations for the duct bank — or performed them incorrectly — and in many cases the companion pulling tension calculations were skipped as well. The cables were sized from a table, pulled in, buried, and loaded. The design looked fine on paper. Underground, it was cooking from the day it was energized.
What the Rules Actually Say
For cables in underground duct banks, ampacity is not a simple table lookup. NEC Article 310 and its Annex B are built on the Neher–McGrath method (the 1957 Neher and McGrath paper, with ampacity tables standardized in IEEE 835), which calculates conductor temperature from every heat source and every thermal resistance between the copper and the open air. The result depends on the number and size of conduits and conductors, the configuration and spacing of the bank, the depth of earth above it, the backfill material, the thermal resistivity of the soil, the design load — and, critically, the load factor: the average load as a percentage of the peak. That is why owner standards for data centers routinely require these calculations for large duct banks: they are the only way to know whether the bank can carry its load for its design life.
Soil dry-out: the failure that builds its own furnace
Soil conducts heat well when it is moist and poorly when it is dry. A loaded duct bank warms the soil around it, and the warmth drives moisture away from the bank — moisture migration. The dried zone that forms has a much higher thermal resistivity (rho): soil assumed at rho 90 in design can dry to rho 120, 150, or beyond. Higher rho means the heat escapes more slowly, so the cables run hotter, which dries the soil further. It is a slow feedback loop that runs for years, which is exactly why these feeders so often fail long after everyone has forgotten the design — and why a calculation done with optimistic, moist-soil assumptions can be worse than none at all.
Figure 2 — Soil dry-out: heat from the conduits drives moisture outward, leaving a cracked, dry halo that insulates the bank and traps still more heat.
Key Numbers — Duct Bank Heating
Load factor in data centers commonly runs 80–100% — the worst case for duct bank heating, with no cool-down hours
Soil thermal resistivity (rho): 90 °C·cm/W is the usual moist-soil design value; dried-out soil reaches 120–150+
Insulation life roughly halves for every 10 °C a conductor runs above its temperature rating
The center ducts of a bank run the hottest — mutual heating is why configuration and spacing are calculation inputs, not details
A worked example (illustrative)
Take a six-duct bank of large copper feeders serving a data center at a 100% load factor — the load never rests, so neither does the heating. Run the Neher–McGrath calculation with moist soil at rho 90 and the bank has a definite ampacity; load the feeders to that value and the hottest conductor sits at its 90 °C rating, as designed. Now let the soil dry to rho 150, as the dry-out loop does over years of service: the same bank’s ampacity falls by roughly 12% (Figure 3). Loaded to the original design value anyway, the hottest conductor now runs on the order of 15–20 °C over its rating — and at the rule of thumb above, its insulation life is cut to a fraction of design. A 40-year cable becomes a 5-to-10-year cable, and the first symptom is the nuisance trip nobody could explain.
Figure 3 — Illustrative Neher–McGrath trend for a large duct bank: as soil dries and rho climbs, ampacity quietly falls — whether or not the load does.
How We Approach It at LCA
On the design side, the fix is discipline applied early, while it is still cheap:
Run the heating calculations for every large duct bank. Model the bank as it will actually be built — conduit count, size, spacing, configuration, burial depth, and backfill — and use the facility’s real load factor, not a hopeful one. At 80–100% load factor there is no margin for optimistic assumptions.
Measure the soil; design for the dry case. Thermal resistivity is a testable property of the native soil and the specified backfill. A design that only works with permanently moist soil is a design with an expiration date.
Pair heating calculations with pulling tension calculations. A pull that exceeds tension or sidewall pressure limits, or jams in a bend, damages insulation — and damaged insulation becomes tomorrow’s hot spot. The two calculations protect the same cable from different directions.
On the forensic side, when a feeder has already failed, we work backward: the failed cable and its insulation condition, the as-built configuration of the bank, operating load history, and soil and backfill conditions — then we re-run the heating and pulling calculations the way the design should have been run and compare. That comparison is usually where the case is decided, and it is the analysis we have presented in testimony: whether the engineer met the standard of care is, in the end, a question the calculations answer. For an example of this work in litigation, see the magazine article we published with attorney Elizabeth S. Poeschl: “Mission Critical Facility Design Issues and Legal Ramifications,” Mission Critical Magazine, November/December 2013 (PDF, in the LCA University library).
“A duct bank doesn’t fail the day it’s energized. It fails a little every day the heat has nowhere to go.”
The Takeaway
Run Neher–McGrath heating calculations for every large duct bank — early in design, not after the failure.
Use the real load factor. At 80–100%, the bank never cools, and optimistic assumptions become overheated conductors.
Test the soil and the backfill, and design for dried-out soil — rho is a measured value, not a guess.
Pair the heating calculations with pulling tension calculations; installation damage and operating heat attack the same insulation.
If feeders are tripping, off-gassing, or failing young, get a forensic heating analysis before re-pulling the same design.
About the Author
Keith Lane, PE, RCDD, NTS, RTPM, LC, LEED AP is President, CEO, and Chief Engineer of Lane Coburn & Associates, LLC of Kirkland, Washington, with over 30 years in the electrical construction and engineering industry. This article was co-authored with Scott Coburn, co-founder of LCA. LCA provides electrical design, power system studies — including Neher–McGrath heating and cable pulling tension calculations — and forensic and expert-witness services for mission-critical facilities. Questions about a duct bank, a study, or a failure? Please contact us if you’d like to discuss your project.
Lane Coburn & Associates, LLC | 5535 Lake Washington Blvd NE, Suite 309, Kirkland, WA 98033 | 206-499-5221 | lanecoburn.com
Watch the companion videos: youtube.com/@lanecoburnassociates | LCA University articles are educational and do not replace project-specific engineering.