Lane Coburn & Associates, LLC

LCA University

Engineering, Explained.

Plain-language lessons from the engineers at Lane Coburn & Associates — the calculations, code requirements, and field judgment behind mission-critical electrical design, taught the way we explain it to owners, contractors, and reviewers.

Kirkland, Washington Electrical engineering & telecommunications consulting Mission-critical facilities & data centers
Meet Your Instructor

Keith Lane, P.E., RCDD, NTS, RTPM, LC, LEED A.P.

President/CEO & Chief Engineer, Lane Coburn & Associates, LLC

Electrical engineer and trial-experienced expert witness with hands-on construction experience. Keith is the author behind LCA University — these lessons come straight from his design, forensic, and expert-witness work.

View expert qualifications

Start with the newest lessons — or dig into the archive

Pick a collection below. Each new article opens as the full article (PDF) from the LCA Engineering Library; the previous articles are LCA's published magazine work — tap any cover to open the original article.

The newest LCA articles. All 15 articles from the LCA Engineering Library are below — tap any card to open the full article (PDF).

Open the LCA Engineering Library
Cross-section of a duct bank beneath a data center, its center conduits glowing hottest — cover image for “Cooked in the Ground: Why Underground Feeders Overheat — and Fail” Article 15 · Newest Cooked in the Ground: Why Underground Feeders Overheat — and Fail Keith Lane and Scott Coburn · Underground Power Systems & Forensic Engineering Nuisance tripping, off-gassing, and feeders failing years early — traced to Neher-McGrath heating calculations that were never run, and the soil dry-out loop that cooks a duct bank from the inside. Read the article Engineers coordinating a cable pull — cover image for “Coordinating Cable Heating and Pulling Studies” Article 01 Coordinating Cable Heating and Pulling Studies LCA Engineering Library Coordinate Neher–McGrath cable ampacity and thermal analysis with cable pulling tension, sidewall pressure, conduit fill and staged installation planning. Read article (PDF) Shelton site view — cover image for “Using Animated Models to Explain Electrical Construction” Article 02 Using Animated Models to Explain Electrical Construction LCA Engineering Library See how 2D electrical plans become 3D construction animations, from Shelton site views and UPS replacements to local feeder distribution and overhead corridor coordination. Read article (PDF) Underground cable thermal dry-out illustration — cover image for “Investigating Underground Cable Overheating” Article 03 Investigating Underground Cable Overheating LCA Engineering Library Explore soil thermal resistivity, moisture migration and dry-out, operating loads and the evidence needed to investigate underground cable overheating. Read article (PDF) Endurance one-line diagram — cover image for “Evaluating Primary Metering and Customer Owned Transformers” Article 04 Evaluating Primary Metering and Customer Owned Transformers LCA Engineering Library Use an actual Endurance one-line to explore medium-voltage service, revenue metering, customer-owned transformers, protection and utility rate considerations. Read article (PDF) Microgrid one-line detail — cover image for “What a Microgrid Can Do for a Facility” Article 05 What a Microgrid Can Do for a Facility LCA Engineering Library Explore microgrid objectives, battery energy storage, islanded operation, source separation and commissioning through the Endurance microgrid one-line. Read article (PDF) First page of the 2013 Mission Critical article “Mission Critical Facility Design Issues and Legal Ramifications” by Keith Lane and Elizabeth S. Poeschl Article 06 · From the Archive Mission Critical Facility Design Issues and Legal Ramifications Keith Lane and Elizabeth S. Poeschl · Mission Critical, Nov/Dec 2013 Explores Neher–McGrath heating calculations, soil thermal resistivity and compaction, and distinguishes failure investigation from evaluating the original standard of care. Original publication reproduced unchanged. Read archival article (PDF) UPS input equipment — cover image for “When the Arc Flash Model Does Not Match the Installation” Article 07 When the Arc Flash Model Does Not Match the Installation Keith Lane and Scott Coburn An arc-flash report can look complete while its electrical model describes an earlier version of a facility. A feeder change, replacement UPS or different protective device may leave the model out of step with the installation. Read article (PDF) Engineers coordinating a cable pull — cover image for “A Cable Pull Can Pass Tension and Still Have Installation Problems” Article 08 A Cable Pull Can Pass Tension and Still Have Installation Problems Keith Lane and Scott Coburn A passing pulling-tension result answers one question about a cable installation. It does not establish that every bend, conduit section or handling operation is acceptable. Read article (PDF) Cable pull staging route — cover image for “Where to Break a Long Cable Pull” Article 09 Where to Break a Long Cable Pull Keith Lane and Scott Coburn When a continuous pull exceeds a force limit, stages may provide a workable alternative. The proposed break also needs a practical place to receive, handle and refeed the cable without damage. Read article (PDF) Shelton facility rendering — cover image for “Replacing a UPS Starts Before the Equipment Arrives” Article 10 Replacing a UPS Starts Before the Equipment Arrives Keith Lane and Scott Coburn A UPS replacement is an equipment project, a distribution-system change and a construction operation in an operating facility. A model number and footprint do not define all that work. Read article (PDF) Primary protection one-line detail — cover image for “Selective Coordination in Mission Critical Facilities” Article 11 Selective Coordination in Mission Critical Facilities Keith Lane and Scott Coburn A fault on one branch should not unnecessarily remove healthy portions of a mission-critical facility from service. Selective coordination evaluates how protective devices work together to limit that interruption. Read article (PDF) Shelton 2D plan — cover image for “What Makes a Construction Set Ready for the Field” Article 12 What Makes a Construction Set Ready for the Field Keith Lane and Scott Coburn A construction set should let the team understand the work, locate equipment and identify installation and acceptance requirements. Repeated reviews help only when resulting changes remain coordinated. Read article (PDF) Forensic investigation illustration — cover image for “What Electrical Drawings Can Establish in a Forensic Investigation” Article 13 What Electrical Drawings Can Establish in a Forensic Investigation Keith Lane and Scott Coburn A drawing explains design intent, but does not by itself prove what was installed, how it operated or why it failed. Drawings, permits, photographs, tests and observations each establish something different. Read article (PDF) Ship’s main switchboard room in navy and gold — cover image for “Power at Sea: Why a Ship’s Electrical System Has to Save Itself” Article 14 Power at Sea: Why a Ship’s Electrical System Has to Save Itself Keith Lane · Marine & Shipboard Power Systems A ship at sea has no utility to fall back on — its generators, switchboards and cables are the entire power system. Covers grounding to the hull and first-fault operation, plus the five studies — load analysis, short-circuit, coordination, arc-flash, and voltage drop and motor starting — under 46 CFR Subchapter J, ABS, IEEE 45 and SOLAS. Read the article

What LCA University teaches

Every lesson follows the same arc — the problem we see in the field, what the rules actually say, the key numbers, and how we approach it at LCA.

Cable Pulling & Pulling Tension Neher–McGrath & Underground Ampacity Selective Coordination UPS & Critical Power Fault Current Calculations Duct Bank Heating Lightning Protection Data Center Electrical Design

Prefer to watch? The lessons are on video, too.

LCA's YouTube channel carries animated construction visualizations, project flyovers, and walkthroughs of the same systems the articles teach — the articles and the videos feed each other.

Visit the LCA YouTube channel

Questions readers ask

What is LCA University?

LCA University is the teaching-article series of Lane Coburn & Associates, LLC — “Engineering, Explained.” Each lesson explains the calculations, code requirements, and field judgment behind mission-critical electrical design in plain language, the way LCA explains them to owners, contractors, and reviewers.

Who writes the LCA University articles?

The articles are written by Keith Lane, President/CEO and Chief Engineer of Lane Coburn & Associates, and draw directly on his design, forensic, and expert-witness work. Scott Coburn, co-founder of the firm, is co-author of several lessons, including “Cooked in the Ground” and the cable-pulling series.

What topics do the articles cover?

Topics include cable pulling and pulling tension, Neher–McGrath calculations and underground ampacity, duct bank heating and soil dry-out, shipboard electrical systems, selective coordination, UPS and critical power, fault current calculations, arc flash, and data center electrical design.

Are the articles free to read?

Yes. Every article on this page is free to read — tap any New Articles card to open the full article (PDF), and the Previous Articles archive links to LCA’s published magazine articles.

Who are Keith Lane and Scott Coburn?

Keith Lane, P.E., RCDD, NTS, RTPM, LC, LEED A.P. is President/CEO and Chief Engineer of Lane Coburn & Associates, a professional electrical engineer licensed in 20 states and a trial-experienced expert witness with 41 expert-witness cases. Scott Coburn co-founded Lane Coburn & Associates with Keith in 2007.

How do I contact Lane Coburn & Associates about a study or a project?

Call Lane Coburn & Associates at 206-499-5221 or email klane@lanecoburn.com. The firm’s office is at 5535 Lake Washington Blvd NE, Suite 309, Kirkland, WA 98033, and its main website is lanecoburn.com.